+38 044 237 79 41
Kyiv, Borshchagivska Str. 154, office 2-1

Implementation of the feasibility study "The scheme of connection to the electric networks of JSC" Prykarpattyaoblenergo"of a wind power station (WPP) with a capacity of 90 mW, which is located on the territory of the village Pasechny and the village Zelena Nadvirna district of the Ivano-Frankivsk region".